Ford, BMW lead Solid Power’s $130M Series B round

0
A Solid Power manufacturing engineer holds two 20 ampere hour (Ah) all solid-state battery cells for the BMW Group and Ford Motor Company. The 20 ampere hour (Ah) all solid-state battery cells were produced on Solid Power’s Colorado-based pilot production line. Source: Solid Power. Solid state battery systems have long been considered the next breakthrough in battery technology, with multiple startups…
« Previous post: | Next post: »